Highway 6 Section 18 from Iron to Ein Tut – 16 km long Freeway

Est. Construction Cost:
1 Billion ILS

Design and Construction Period:
2009-2001

Client: Trans-Israel Highway

Geographic Location: North

Description: 16 km long dual-carriageway three-lane freeway (first stage-two lanes per direction) in the section of Highway 6 between the Iron Interchange and Ein Tut Interchange

Amy Metom Role in the Project: Preliminary design, preparation of the Statutory outline plan, and consultation during its approval by the National Planning Council (16 km); detailed design for construction including coordination of the consulting team (11 km) and including the Ein Tut Interchange with Highway 70

Unique Elements of the Project: 350 m long tunnel, 150 m long wildlife passage an approximate 2.2 km of bridges

Next
Font Resize
Contrast