Est. Construction Cost:
1 Billion ILS
Design and Construction Period:
2009-2001
Client: Trans-Israel Highway
Geographic Location: North
Description: 16 km long dual-carriageway three-lane freeway (first stage-two lanes per direction) in the section of Highway 6 between the Iron Interchange and Ein Tut Interchange
Amy Metom Role in the Project: Preliminary design, preparation of the Statutory outline plan, and consultation during its approval by the National Planning Council (16 km); detailed design for construction including coordination of the consulting team (11 km) and including the Ein Tut Interchange with Highway 70
Unique Elements of the Project: 350 m long tunnel, 150 m long wildlife passage an approximate 2.2 km of bridges