Highway 2 – 11 km long 3-lane freeway in the section between Caesarea and Zichron Yakov

Est. Construction Cost:
500 Million ILS

Design and Construction Period:
2008 - 2014

Client: National Roads Company of Israel

Geographic Location: North

Description: 11 km long dual-carriageway 3-lane high-speed roadway between the Or Akiva interchange and the Zichron Yakov Interchange

Amy Metom Role in the Project: Preliminary design, preparation of the Statutory outline plan and consultation during its approval at the National Infrastructure Commission in collaboration with a team of consultants

Unique Elements of the Project: Diversion of an approximately 300 m long existing roadway alignment in order to enable widening of the village of Jasser A-Zarka and construction of a new divider adjacent to the village