Highway 4 in the section between Binyamina and Zichron Yakov, intersection layout, bridges above railway tracks and the Taninim Stream

Est. Construction Cost:
200 Million ILS

Design and Construction Period:
2000-2007 ;2007-2010

Client: National Roads Company of Israel

Geographic Location: Haifa Area

Description: Detailed design of an approximately 4 km long main highway including layout of intersections and bridges above railway tracks and the Taninim Stream

Amy Metom Role in the Project: Preliminary and detailed design Traffic, geometry, drainage and bridging

Unique Elements of the Project: Bridge above tracks Construction staging

Prev Next
Font Resize
Contrast