Krayot Bypass – southern section

Est. Construction Cost:
125 Milion ILS

Design and Construction Period:
1995-2009;2010-2006;2010-2013

Client: National Roads Company of Israel

Geographic Location: Haifa Area

Description: 6 km long high-speed suburban highway with three interchanges

Amy Metom Role in the Project: Preliminary design Traffic, geometry, signage, drainage and utility coordination

Unique Elements of the Project: Design coordination of principal utility systems including high-voltage electric lines, fuel lines, hazardous materials and water pipelines

Prev Next
Font Resize
Contrast