National Highway no. 89 – from Maalot to Hurfeish

Est. Construction Cost:
40 Million ILS

Design and Construction Period:
1995-2013;2003-2014

Client: National Roads Company of Israel

Geographic Location: North

Description: Preliminary and detailed design of a 4 km long roadway in mountainous countryside within a nature reserve Traffic design, geometry, bridging and drainage

Amy Metom Role in the Project: Preliminary and detailed design Statutory outline plan, traffic, geometry, drainage and bridging

Unique Elements of the Project: Bridge above the Kziv Stream Service road Division into sections

Prev Next
Font Resize
Contrast