Highway 6 Section 18 – Bridge design

Est. Construction Cost:
800 Million ILS

Design and Construction Period:
2000-2009

Client: Trans-Israel Highway

Geographic Location: 6 road Iron to Ein-Tut

Description: Design of five 250 m long precast segmental bridges using the balanced cantilever assembly method; design of a 130 m long cast and post-tensioned bridge; design of girder bridges; design of an ecological corridor with a cut & cover tunnel; and design of small elements such as culverts and retaining walls

Amy Metom Role in the Project: Structural designer

Unique Elements of the Project: Precast segmental bridges