System of bridges on Highway 4 in the Binyamina-Furadis section

Est. Construction Cost:
145 Million ILS

Design and Construction Period:
2006-2010

Client: National Roads Company of Israel

Geographic Location: 4 road Binyamina-Furadis

Description: Design of two precast segmental bridges above railway tracks; two arched viaduct bridges; and two bridges above the Taninim Stream and above an aqueduct with precast beams.

Amy Metom Role in the Project: Design

Unique Elements of the Project: Precast segmental bridges having a maximum span of 63 m and total area of 10,500 m²; the viaduct has a total area of 7,220 m² with an arched façade.

Prev Next
Font Resize
Contrast