Bridge No. 6 in the high-speed railway line to Jerusalem in the A1 alignment

Est. Construction Cost:
120 Million ILS

Design and Construction Period:
2003-2008

Client: Israel Railways

Geographic Location: North of Latrun

Description: Preliminary, final and detailed design of a railway bridge comprised of two 1,200 m long parallel bridges having an area of 18,000 m² with 23 spans, each with a length of 55 m and height of 35 m above the ground.

Amy Metom Role in the Project: Structural designer

Unique Elements of the Project: The bridge was constructed by casting one span after the other using a movable scaffolding system for the first time in Israel

Prev Next