Bridging system on Hagiborim Road in Haifa

Est. Construction Cost:
45 Million ILS

Design and Construction Period:
2007-2013

Client: Yefe Nof

Geographic Location: Haifa

Description: Design of a pair of cast-on-site segmental bridges above the Giborim Stream, another precast girder bridge and two bridges above Wadi Rushmiya.

Amy Metom Role in the Project: Design

Unique Elements of the Project: Cast-on-site segmental bridges having a maximum span of 75 m and total area of 4,400 m2