Est. Construction Cost:
45 Million ILS
Design and Construction Period:
2007-2013
Client: Yefe Nof
Geographic Location: Haifa
Description: Design of a pair of cast-on-site segmental bridges above the Giborim Stream, another precast girder bridge and two bridges above Wadi Rushmiya.
Amy Metom Role in the Project: Design
Unique Elements of the Project: Cast-on-site segmental bridges having a maximum span of 75 m and total area of 4,400 m2