Highway 431 – bridges at the Ramle Interchange

Est. Construction Cost:
40 Million ILS

Design and Construction Period:
2003-2008

Client: National Roads Company of Israel

Geographic Location: 431-40 Interchange

Description: Design of two bridges at the Highway 431 interchange with Highway 40 and design of an aqueduct

Amy Metom Role in the Project: Structural designer

Unique Elements of the Project: Aqueduct bridge in a cast and posttensioned channel cross-section The bridges were based on slurry walls and were constructed from the top down.

Prev Next
Font Resize
Contrast