Bridging system above Checkpost

Est. Construction Cost:
35 Million ILS

Design and Construction Period:
1998-2007

Client: Yefe Nof

Geographic Location: Haifa

Description: Design of a pair of bridges above the Krayot Junction (Checkpost) Total length of bridging – 1,050 m. The bridge decking is comprised of a continuous post-tensioned concrete slab. The bridge columns were designed as a combination of concrete and steel.

Amy Metom Role in the Project: Design

Unique Elements of the Project: Posttensioned slab and channel beams. Constructed while traffic continued unabated at the most highly traveled intersection in northern Israel.