Tunnels in the railway line to Modi’in

Est. Construction Cost:
50 Million ILS

Design and Construction Period:
2003-2006

Client: Israel Railways

Geographic Location: Entrance to Modi'in

Description: Tunnels designed using the cut and cover method in the railway line to Modi'in. 1000 m long tunnel, 15 m wide and 10 m high. This project included an arched concrete tunnel and underground energy structure.

Amy Metom Role in the Project: Design

Unique Elements of the Project: The tunnel arch is comprised of 32 cm thick concrete supporting 7 m of fill. The energy building is based on the arch.

Prev
Font Resize
Contrast