Beit Shean-Hamat Gader Railway

Est. Construction Cost:
4.2 Billion ILS

Design and Construction Period:
2011 - Not Completed

Client: Israel Railways

Geographic Location: North

Description: Design of 30 km of double railway track between Beit Shean and Hamat Gader.

Amy Metom Role in the Project: Lead Designer

Unique Elements of the Project: 7 km of tunneling works

Prev Next
Font Resize
Contrast