High-speed railway track between Haifa and Tel Aviv

Est. Construction Cost:
710 Million ILS

Design and Construction Period:
2011 - Not Completed

Client: Israel Railways

Geographic Location: coastal plain

Description: Design of 23 km of four railway tracks with design speeds of 250 km/h and suburban railway tracks for design speeds of 160 km/h along the Binyamina-Netanya section of the Haifa-Tel Aviv Railway

Amy Metom Role in the Project: Lead Designer

Unique Elements of the Project: Track geometries adapted to high-speed travel on a railway line that integrates high-speed and suburban rail functions.

Prev Next
Font Resize
Contrast