Extension of the Eastern Wharf at Haifa Port

Est. Construction Cost:
95 Million ILS

Design and Construction Period:
1994-1994

Client: Israel Ports Company

Geographic Location: Port of Haifa

Description: Extension of the wharf by 350 m that included 30 m deep and 430 m long sheetpile walls, land reclamation in parallel with the secondary breakwater and deepening of the access channel into the port

Amy Metom Role in the Project: Design

Unique Elements of the Project: Marine dredging works for the port entrance channel and filling of the wharf area with the excavated material