Extension of crane beams and development of the Crane B area [at Haifa Port]

Est. Construction Cost:
34 Million ILS

Design and Construction Period:
2006-2010

Client: Israel Ports Company

Geographic Location: Port of Haifa

Description: The existing Crane B was 264 m long. This project included the paving of roadways and storage areas for containers on the reclaimed land and existing area of the Eastern Wharf [of Haifa Port] and integrated communications, electrical and water systems.

Amy Metom Role in the Project: Design

Unique Elements of the Project: Installation of vertical piles through the secondary breakwater at the port.