Est. Construction Cost:
25 Million ILS
Design and Construction Period:
2001-2005
Client: Israel Ports Company
Geographic Location: Port of Haifa
Description: Berthing area for tugboats and pilot boats for the port and onshore compound for the Marine Department that included the reclamation of 2200 m² with a 260 m long and 22 m deep sheetpile wall in order to enclose the basin.
Amy Metom Role in the Project: Design
Unique Elements of the Project: The sheetpile wall that encloses the basin is anchored with tensile bars that penetrate the secondary port breakwater.