Construction of the Marine Department Basin at Haifa [Port]

Est. Construction Cost:
25 Million ILS

Design and Construction Period:
2001-2005

Client: Israel Ports Company

Geographic Location: Port of Haifa

Description: Berthing area for tugboats and pilot boats for the port and onshore compound for the Marine Department that included the reclamation of 2200 m² with a 260 m long and 22 m deep sheetpile wall in order to enclose the basin.

Amy Metom Role in the Project: Design

Unique Elements of the Project: The sheetpile wall that encloses the basin is anchored with tensile bars that penetrate the secondary port breakwater.