Busia-Malaba/Bugiri, Uganda – Highway Rehabilitation

Est. Construction Cost:
3 Million ILS

Design and Construction Period:
2014-2010

Client: SBI

Geographic Location: Africa

Description: Rehabilitation of 82.5 km of highway in Uganda

Amy Metom Role in the Project: Traffic design, general earthworks design, roadway design, surface drainage design (in channels or carriers), earthworks designed for lots

Unique Elements of the Project: Characterized by heavy traffic loads, main route on which heavy trucks travel carrying goods between Uganda and Kenya

Prev
Font Resize
Contrast