Kibbutz Ein Gedi project

Est. Construction Cost:
5.8 Million ILS

Design and Construction Period:
2014 - 2009

Client: Ministry of Construction

Geographic Location: South

Description: Early planning for upgrading the kibbutz and of the extension neighborhoods.

Amy Metom Role in the Project: Early planning and preparation of a traffic addendum for the urban building scheme.

Unique Elements of the Project: Area with very high slopes having saline soil accompanied by sinkholes

Prev Next
Font Resize
Contrast