Road 44-overpass No 208

Est. Construction Cost:
200 Million ILS

Design and Construction Period:
2011-2016

Client: National Roads Company of Israel

Geographic Location: Ramle

Description: Preliminary, final and detailed design of an approximately 30 m width and 100 m long bridge above Railway and ramp, with 3 span of about 30-38 meter. The deck is with prestressed precast beams.

Amy Metom Role in the Project: Structural designer

Unique Elements of the Project: The project is crossing above a railway and through a city with a lot of underground utilities.